INSAN CENDEKIA MANDIRI UNIVERSITY BANDUNG
_
Campus UICM - UNBAR : Jl. Pasir Kaliki No.199, Sukabungah, Kec. Sukajadi, Kota Bandung, Jawa Barat 40162
Lecture at UICM Bandung is main solutions improve career or got new job (please click)
Speak also : Objectives of Operation Selection System Student Education System and Certificates Terms College Student, Procedure & Schedules Admission Lectures Time & Lecturers City Transportation

Tuition Fees
(review on Google)

In principle Insan Cendekia Mandiri University Bandung belongs to the people who always put the quality of higher education.
However, UICM Bandung Leading the Higher Education and Accreditation still has SOCIAL COMMITMENT. Among others, to assist students in paying the cost of education by providing tuition credit facilities without interest, so the tuition fee can be paid in installments according to the ability of prospective students. In addition, some private universities provide scholarships directly to truly less well off financially.



UICM Bandung to make the cost of education is only comprised of 2 components only.

1. Development Contributions (SPb) or Money Jetty


The UKT has included BPP Basic, cash credits, examination fees, registration, and money practicum each semester. Any number of credits taken in a semester, tuition did not change.
This UKT is paid each semester to a few times,, which can be repaid six times (1 semester = 6 months) with
» The first minimum payment = IDR. 750.000 proceed to S1 and D3 Program.
» The first minimum payment = IDR. 800.000 proceed to S1 (RPL).
And the remainder scheduled to yourself appropriate installment table below.

However, especially for a truly in financial difficulties, can create a table in accordance with the installment own financial capabilities.
 

2. Contribution of Education each semester (SPP)


 

Total First Payment


Total First Payment = Installment 1 for the SPb + Installment 1 for the SPP :
» IDR. 750.000 to proceed to S1 & D3 Program.
» IDR. 800.000 to continue to S1 Accounting, Animal Husbandry,» IDR. 600.000 to proceed to S1 (RPL)

The remaining installments paid in installments as the table below.


Table Installment
Development Contributions (SPb)

Program Perkuliahan Shift (Hybrid / Blended) UICM Bandung

A.1.Table Installment of UKT RPL in UICM
For graduate SMA, SMK, equivalent proceed to S-1 Program (RPL)
InstallmentThe number and amount of installments
24 x12 x6 x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
--
--
--
--
--
--
--
--
3.050.000
3.050.000
3.050.000
3.050.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
18.000.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.2.Table Installment of UKT in UICM
For graduate SMU, SMK, D3, Polytechnic, equivalent proceed to S-1
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
750.000
650.000
650.000
650.000
650.000
650.000
800.000
800.000
800.000
800.000
800.000
--
1.000.000
1.000.000
1.000.000
1.000.000
--
--
1.350.000
1.350.000
1.300.000
--
--
--
4.000.000
--
--
--
--
--


A.3.Table Installment of UKT in UICM - Department of Chemical Engineering, Industrial Engineering And Management
For graduate SMU, SMK, D3, Polytechnic, equivalent proceed to S-1
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
750.000
700.000
700.000
700.000
700.000
700.000
850.000
850.000
850.000
850.000
850.000
--
1.050.000
1.075.000
1.075.000
1.050.000
--
--
1.450.000
1.400.000
1.400.000
--
--
--
4.250.000
--
--
--
--
--


A.4.Table Installment of UKT in UICM - Accounting, Livestock, Gardening
For graduate SMU, SMK, D3, Polytechnic, equivalent proceed to S-1
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
750.000
850.000
850.000
850.000
850.000
850.000
1.000.000
1.000.000
1.000.000
1.000.000
1.000.000
--
1.250.000
1.250.000
1.250.000
1.250.000
--
--
1.700.000
1.650.000
1.650.000
--
--
--
5.000.000
--
--
--
--
--


A.5.Table Installment of UKT in UICM - Textile Chemical Technology and Textile Chemical Technology
For graduate SMU, SMK, proceed to D-3
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
750.000
620.000
620.000
620.000
620.000
620.000
750.000
775.000
775.000
775.000
775.000
--
1.000.000
950.000
950.000
950.000
--
--
1.300.000
1.300.000
1.250.000
--
--
--
3.850.000
--
--
--
--
--




Table Installment
Contribution of Education each semester (SPP)

Perkuliahan Shift (Hybrid / Blended) Insan Cendekia Mandiri University Bandung

B.1.Table Installment of UKT in UICM - Textile Chemical Technology and Textile Chemical Technology
For graduate SMU, SMK, proceed to D-3
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
750.000
620.000
620.000
620.000
620.000
620.000
750.000
775.000
775.000
775.000
775.000
--
1.000.000
950.000
950.000
950.000
--
--
1.300.000
1.300.000
1.250.000
--
--
--
3.850.000
--
--
--
--
--


Views  Mobile1, 2 laptop iconLaptop 
Information Services
Tel/Fax : (021) 8762002, 8762003
Mobile/SMS : 0817 0816 486,
0811 1990 9028, 0811 1990 9026
WA : 0811 1990 9028, 0811 1990 9026
Register Online
Get the Scholarship Info
eduNitas.com
Perubahan Dimulai Dari #BeraniKuliah
HOME- Porch

Online Registration

Profile UICM Bandung

New Student Admission

Study Program
Prospectus Career
Curriculum (Major)
Education System
Lectures Time & Lecturers
Study Period & SKS Load

Download Form
Request Brochures - free
Online Registration
Request Scholarships
Contact us
List Scholarship Recipients

UICM Bandung web list
Employee Class Web
Main Websites

Main Solutions
Improve Career or Got New Job

Government & Constitution Supporting Perkuliahan Shift (Hybrid / Blended)

܀ Bandung
܀ Special Studies




Principal Site
All Reader
UICM Bandung   ☉   Quality of Teaching System A
_